Parramatta Park

Parramatta Park Riverbank Stabilisation

Parramatta Park Trust engaged two contractors to carry out embankment stabilisation on the Parramatta River. 
The Hills Bark Blower worked with both contractors to fill bags placed on the bank with a mix specially developed for the job.

The bags were planted into after the media was installed by slitting holes in the side. 
The technique used is a new method that looks to be a potential solution to the erosion problem there.