Meriton Apartment Complex

 
Client: Plumb Group
Product: 4,500 Tonnes 20mm Blue Metal

The Hills BARK BLOWER trucks were able to supply and install approximately 4,500 Tonne of 20mm Blue Metal to the base of a future Meriton Apartment Complex being developed near Sydney Airport. The day these photos were taken, the BARK BLOWER staff installed 150T of Blue Metal safely and efficiently to the designated areas ready for application.The 30,000 square metre site required an aggregate layer installed to a depth of 100mm.