Kurnell Desalination Plant
Blue Water Joint Venture
The erosion control project was solved by applying a seeded EcoBlanket to a slope approximately 20 000m² in area. The images below show the area before application, the process of installing an EcoBlanket and the cover crop germination within 2 weeks of the completed job.